An ADU permit set is the bundled package of drawings, calculations, and forms that a Colorado building department reviews before it allows anyone to build an accessory dwelling unit. A complete adu permit set colorado reviewers will accept ties together state law under HB24-1152, local zoning, and the adopted building codes. This guide breaks down each sheet, compares Denver with other jurisdictions, walks through the Denver process, flags the mistakes that trigger revisions, and points to the official sources for fees and grants.

What Is an ADU Permit Set in Colorado?

An ADU permit set in Colorado is the complete plan package submitted to a local building department to obtain a building permit for an accessory dwelling unit. It normally includes a site plan, architectural drawings, structural sheets, energy compliance information, and mechanical, electrical, and plumbing details. Reviewers read the set as a single document, so every sheet must agree with the others.

Permit sets for ADUs are smaller than those for a full house, yet they carry the same legal weight. A reviewer checks the ADU plans against the adopted International Residential Code or International Building Code edition, the local amendments, and the zoning ordinance for the parcel.

How Does a Permit Set Differ From a Permit Application and a Building Permit?

A permit set differs from a permit application because the set contains the technical drawings, while the application is the form and fee that opens the review. The building permit is the approval issued after reviewers accept the submittal. Three separate things exist: the drawings, the request, and the authorization.

Confusing them causes early delays. An applicant can fill out every field of the permit application and still receive a rejection notice because the plan set lacks a structural sheet. Many departments run a pre-submittal check for a complete submittal before formal plan review begins, and that check looks at the drawings first.

What Counts as a Separate Dwelling Unit Under Colorado ADU Rules?

A separate dwelling unit is a living space with its own provisions for sleeping, cooking, and sanitation, which is the baseline definition behind an accessory dwelling unit. A detached ADU, a basement apartment, and a garage conversion all qualify when they contain those three functions. Local codes add their own wording, so the definition in the jurisdiction’s zoning code controls.

The classification changes what the plans must show. A unit with a kitchen triggers egress, smoke and carbon monoxide alarm, and energy requirements that a simple bedroom addition may avoid. The garage to adu conversion guide explains why slab, wall, and header conditions need their own drawings when a garage becomes a dwelling.

What Are the Rules for ADUs in Colorado Under HB24-1152?

The rules for ADUs in Colorado start with HB24-1152, a state law that requires certain jurisdictions to allow accessory dwelling units on lots with a single-unit detached home in residential zones. The statute is codified in C.R.S. 29-35-401 through 405. It sets a statewide floor, and local governments keep authority over many specifics.

The Colorado Department of Local Affairs, through its Division of Local Government (DLG), publishes an ADU Toolkit and model code language. Designers should read those resources alongside the local ordinance. The colorado adu laws hb24-1152 article covers the homeowner-side implications in more depth.

Which Jurisdictions Are Subject Jurisdictions Under C.R.S. 29-35-401 Through 405?

Subject Jurisdictions are the municipalities and counties the statute directly obligates to permit ADUs, and the list is tied to population and metropolitan planning criteria. DLG separately describes ADU Supportive Jurisdictions, which are communities that opt into similar policies without being compelled. A designer should confirm which category the parcel falls into before drafting.

The category affects how much room the local code has to restrict the project. In a subject jurisdiction, the statute narrows what the city or county may require. Outside that group, the permit set must follow whatever the local ADU ordinance says, which may be more or less permissive.

What Can Local Zoning Still Regulate in an ADU Permit Set?

Local zoning can still regulate setbacks, building height limits, lot coverage, design standards, and historic or overlay district rules. Many items fall under the local jurisdiction even when state law applies, so the site plan must demonstrate compliance with the local residential zone districts. Planned Unit Developments (PUDs) and private covenants add another layer.

The statute also limits specific local conditions, and DLG’s toolkit explains where those limits sit. Verify current wording on the official pages before relying on any summary, because ordinances change after adoption. The permit set should cite the zone district and the applicable code section on the cover sheet so reviewers can trace each assumption.

Have Questions About This Project?

ISTA Engineers’ licensed Colorado structural engineers can review your specific site conditions and give you a clear scope before you commit to anything.

What Is Included in an ADU Permit Set in Colorado?

An ADU permit set in Colorado typically includes a cover sheet, site plan, floor plans, elevations, building sections, structural drawings, energy compliance documents, and mechanical, electrical, and plumbing information. Application forms and supporting documents travel with the set. Exact sheet requirements come from the local building department, so confirm the checklist before drafting.

The table below shows the usual sheets, what each one proves, and who normally prepares it. Preparers vary by project, and some jurisdictions require stamped drawings from a licensed design professional for specific sheets.

Sheet or Document What It Shows Typically Prepared By
Cover sheet and code summary Governing codes, zone district, scope, occupancy Designer or architect
Site plan Property lines, setbacks, existing home, utilities, parking Designer or surveyor
Floor plans Room layout, egress, kitchen, bath, smoke and CO alarms Designer or architect
Elevations and sections Height, roof form, wall assemblies, insulation Designer or architect
Foundation and framing plans Footings, walls, beams, headers, roof framing, lateral system Structural engineer
Structural calculations and details Loads, member sizing, connections, hold-downs Structural engineer
Energy compliance Insulation, windows, air sealing, mechanical efficiency Designer or energy consultant
MEP information Equipment, panel, fixtures, ventilation Designer or licensed trades
Application forms Owner, contractor, valuation, contact information Applicant

Which Site Plan and Architectural Sheets Does Plan Review Expect?

The site plan and architectural sheets show reviewers that the ADU fits the lot and meets zoning before anyone examines the framing. The site plan locates property lines, easements, the principal dwelling, the ADU footprint, setbacks, and off-street parking where required. Floor plans, elevations, and sections then document square footage, height, egress, and wall assemblies.

Dimensions must match across sheets. A building height shown on the elevation should agree with the zoning review notes, and the floor area on the plan should match the figure on the application. Reviewers frequently compare these numbers first, so small inconsistencies produce comment letters.

What Structural, Energy, and MEP Sheets Belong in the Stamped Drawings?

The structural sheets in an ADU permit set show how loads travel from the roof to the soil, and an engineer’s stamp certifies that design. They include foundation plans, framing plans, lateral bracing, connection details, and calculations based on ASCE 7 loads and the adopted building code. Snow load, wind exposure, frost depth, and soil conditions vary by site, so each value must come from the local jurisdiction and a site-specific evaluation.

Energy and MEP sheets complete the package. Energy compliance follows the adopted energy code, and the mechanical, electrical, and plumbing information identifies equipment, panels, and fixtures. ADU Structural Engineering at ISTA Engineers produces the structural portion of the set, including foundation and framing design for detached and attached units.

How Do You Get an ADU Permit in Denver?

An ADU permit in Denver is obtained by submitting the permit set through Denver Community Planning and Development, which processes applications through Denver E-Permits. The sequence runs from zoning check to submittal, plan review, revisions, issuance, inspections, and final approval. Special reviews, such as Landmark review for designated properties, may add steps.

The ordered list below describes the general flow. Denver updates its forms and procedures periodically, so the city’s current guidance governs each step.

  1. Confirm the zone district and ADU eligibility of the parcel with Denver’s zoning resources.
  2. Prepare the permit set, including site plan, architectural drawings, and structural sheets.
  3. Have a licensed contractor submit the application and plans through Denver E-Permits.
  4. Respond to plan review comments with revised sheets and a written response.
  5. Pay fees and receive the building permit, then obtain trade permits for electrical, plumbing, and mechanical work.
  6. Pass the required inspections and receive the Certificate of Occupancy.

Do You Need a Licensed Contractor to Apply for an ADU Permit in Denver?

A licensed contractor is required to apply for an ADU permit in Denver, and homeowners cannot submit the permit application themselves. This rule belongs to Denver’s permitting system and does not describe every Colorado jurisdiction. Other cities and counties set their own applicant rules, and some allow owner-builders under conditions.

The requirement affects scheduling. Owners should choose a contractor before the submittal, because the contractor’s license and information enter the application. Designers and engineers can prepare the drawings in advance and hand them to the contractor for upload.

How Do Plan Review, Revisions, and the Certificate of Occupancy Work?

Plan review in Denver is a multi-discipline check in which reviewers examine zoning, structure, energy, and trade information and return comments if the plans fall short. Applicants answer each comment by revising the affected sheets and resubmitting. Clear responses referencing sheet numbers shorten the cycle.

After issuance, inspections verify that construction matches the approved plans. Footing, framing, and trade inspections come first, and the final inspection leads to the Certificate of Occupancy, which authorizes the ADU for habitation. Field changes to structural members should be reviewed by the engineer of record before the inspector sees them.

How Does the ADU Permit Set Colorado Process Differ Outside Denver?

The ADU permit process outside Denver differs by jurisdiction in forms, applicant rules, submittal portals, and review steps, so the permit set is not one-size-fits-all. Counties such as Adams, Arapahoe, and Boulder handle unincorporated land under their own codes. Cities such as Fort Collins and Grand Junction run separate programs.

The comparison below frames the questions to ask. Every cell is marked for local verification because each jurisdiction publishes its own current rules.

Process Point Denver County (Adams, Arapahoe, Boulder, Mesa) City Program (Fort Collins, Grand Junction)
Who applies Licensed contractor (confirm current rule) Verify locally Verify locally
Submittal method Denver E-Permits County portal or counter; verify locally City portal; verify locally
Zoning step Zoning review inside plan review County zoning or planning review; verify locally Planning approval step; Grand Junction uses a Planning Clearance
Structural sheets Per Denver checklist Verify locally Verify locally
Final approval Certificate of Occupancy Verify locally Verify locally

What Do County Permit Departments Handle Differently From Cities?

County permit departments handle unincorporated parcels, so the same address can fall under a county or a city depending on annexation status. Adams County, Arapahoe County, and Boulder County each publish their own ADU guidance and checklists. Septic systems, well water, and fire district approvals appear more often on county sites than in dense urban lots.

Those site conditions change the permit set. A parcel on a septic system may need health department approval before the building permit is issued, and rural access roads can raise fire department questions. The plans should include whatever utility documentation the county’s checklist lists.

How Do You Find Your Jurisdiction’s ADU Checklist Before Drafting?

The most reliable way to find an ADU checklist is to search the building or planning department website for the city or county that issues permits for the parcel. Fort Collins and Grand Junction maintain their own pages, and Mesa County covers unincorporated land around Grand Junction. Calling the department’s permit counter or requesting a pre-submittal meeting confirms what the website leaves unclear.

Save the checklist and the code edition it cites. Local pages change, and some could not be fully reviewed for this article, so readers should rely on the official source rather than a secondhand summary. Our New Construction Design team starts every detached unit by confirming the governing code edition with the issuing department.

What Are the Common Mistakes When Preparing an ADU Permit Set?

The most common mistakes in an ADU permit set are plans that conflict with zoning, missing or incomplete sheets, and an applicant who lacks the required license. Each triggers a rejection or a lengthy comment letter. Most of these problems appear before plan review starts and can be caught with a checklist.

Short lists help here. The items below cover the recurring causes of delay.

What Do Engineers Commonly See in an ADU Permit Set Before Plan Review?

Engineers commonly see ADU plans that show architecture in detail but treat the foundation and framing as an afterthought. A slab-on-grade design copied from another region may ignore expansive clay common along the Front Range, and a roof framing layout may omit the snow load for the actual elevation. These gaps are technical, and plan reviewers flag them.

Another recurring pattern involves existing buildings. A garage conversion or basement unit often needs new openings, beam sizing, or underpinning, and plans sometimes assume the existing structure is adequate without evidence. Structural Modification Design addresses those existing-structure changes with calculations and details that reviewers can verify.

What Design Standards Should Plans Meet Before Submittal?

ADU plans should meet the local standards for setbacks, height, size, parking, and use, and each figure comes from the jurisdiction’s code rather than a statewide number. A designer should check the setbacks and height limit for the zone district, then check any maximum square footage or minimum lot size that applies. Do not rely on numbers from articles, including this one.

Parking and occupancy rules need the same care. Off-street parking requirements for an ADU, owner occupancy conditions, and rental use limits differ by place and may be restricted in subject jurisdictions by HB24-1152. Verify each item on the official page, then reflect the result on the site plan and cover sheet.

How Much Does an ADU Permit Set Cost in Colorado?

An ADU permit set in Colorado costs whatever the designer, engineer, and jurisdiction charge for the specific project, and no single figure applies statewide. Design fees depend on scope, site complexity, and the number of consultants. Permit fees come from the local fee schedule, which the building department publishes.

For current numbers, request quotes from design professionals and read the official fee schedule for the issuing city or county. This article intentionally avoids stating prices because fees change. The adu structural engineering cost article explains how engineering fees are typically built up.

What Drives the Cost of Building an ADU in Denver and Across Colorado?

Building cost for an ADU in Denver or elsewhere in Colorado depends on unit type, foundation conditions, utilities, finishes, and contractor pricing. A detached new build, a garage conversion, and an interior basement unit have very different scopes. Soil conditions, utility connection distance, and structural upgrades often shift the budget more than finishes.

Property value effects depend on the market, appraisal, and rental potential, so a general claim would mislead. Owners weighing value should ask a local appraiser or lender. The permit set influences cost indirectly, because complete plans reduce revision cycles and contractor change orders.

Are There Grants or Tiny Home Options for ADUs in Colorado?

Colorado has had state-supported ADU grant programs through DLG, but availability changes, so readers should check the official page rather than assume a round is open. The DLG page has noted future funding rounds without guaranteeing current eligibility. Local governments and nonprofits may also run programs, and each defines its own terms.

Tiny homes and prefab units can serve as ADUs when they meet the building code and local zoning. A tiny home on wheels is often treated differently from a permanent structure, while a modular unit on a foundation follows the permit path described above. Whether a county accepts a tiny home as a permanent residence depends on its adopted code, so the permit set must show the foundation, utility connections, and code basis. For broader project support, see Residential Structural Engineering Services.

FAQ

What is included in an ADU permit set?

An ADU permit set includes a cover sheet, site plan, floor plans, elevations, sections, structural drawings and calculations, energy compliance information, and mechanical, electrical, and plumbing details. Application forms accompany the drawings. The local building department’s checklist defines the exact required sheets.

Do I need a licensed contractor to apply for an ADU permit in Denver?

Denver requires a licensed contractor to apply for an ADU building permit, so homeowners cannot submit the application themselves. That rule is specific to Denver and should not be assumed elsewhere. Confirm the current requirement with Denver Community Planning and Development before submitting.

What are the rules for ADUs in Colorado?

Colorado ADU rules begin with HB24-1152, which requires subject jurisdictions to allow ADUs in qualifying residential zones. Local governments still regulate details such as setbacks, height, and design standards. Check the state toolkit from DLG and the local ordinance for the parcel.

Can I put a tiny home on my property in Colorado?

A tiny home can be placed on a Colorado property when local zoning and building codes allow it. Permanent tiny homes on foundations usually follow the standard permit process, while units on wheels face different rules. Each county and city decides, so contact the local planning office first.

Are ADU grants available in Colorado?

ADU grant availability in Colorado changes over time, and DLG has described future funding rounds without guaranteeing an open application. Readers should check the official DLG page and local housing programs for current status before planning around a grant.

Sources

Explore ADU Structural Engineering by City

Ready to Get Started?

Licensed Colorado structural engineers, clear scopes, and reports you can actually use. Tell us about your project and we’ll follow up with next steps.